An architect's fee is earned in stages that a client, a sanctioning office and a contractor can each hold up, and under the profession's own guidelines the liability stays open for up to three years after the keys are handed over. The money plan has to follow the drawing stages, not the value of the contract signed.
When does an architect's fee actually arrive?
The Council of Architecture's conditions of engagement, approved in 2002 and still the text on its site, lay the fee out in seven stages. A retainer of 5% of the total fee, or a set minimum if higher, comes on appointment and is adjusted at the last stage. The running total is 10% on concept designs, 20% on the preliminary scheme, then 30% and 35% around client and statutory approvals, 45% on working drawings and tender documents, and 55% once tenders are invited and analysed.
The other 45% waits for a building. It moves from 65% to 90% as work reaches each fifth of completion, and the last tenth comes only on the completion report and as-built drawings. So a stalled site, an unsanctioned plan or a client short of money can hold back nearly half of a fee whose design work is finished and whose salaries are paid.
What the client's budget does to the fee
Under the same conditions the final fee follows the actual cost of the work, while early stages are billed on an estimate. If the client trims the specification, the last bills shrink although the drawing hours were the same. Documentation and communication is a separate 10% of the professional fee at every stage under the Council's scale, a line many small practices leave off the proposal and then pay from their own pocket.
Work also clusters: a practice with three projects at tender has a thin six months ahead and a full year after. Salaries of junior architects are monthly all through it, which is why a practice reserve and a household reserve belong in two accounts.
How much does the tax change if the same money is fees, not salary?
New regime, FY 2026-27, with cess and no other income. The ₹75,000 standard deduction belongs to salary only.
| Received in a year | Taxed as salary | As fees, flat 50% rule | As fees, 30% spent on the practice |
|---|---|---|---|
| ₹15 lakh | ₹97,500 | no tax | no tax |
| ₹28 lakh | ₹4,13,400 | ₹93,600 | ₹1,99,680 |
| ₹45 lakh | ₹9,43,800 | ₹2,73,000 | ₹5,46,000 |
The flat 50% rule (section 44ADA of the 1961 Act, section 58 of the 2025 Act) lets a resident in one of the professions the law names treat half of the year's receipts as profit, or the actual profit if that is higher. The limit is ₹50 lakh of receipts, or ₹75 lakh if cash is no more than 5% of them, and no other business expense can be set against that half. What an employer pays an employee is taxed as salary even when it is called fees, so calling a job a consultancy does not by itself open the rule. The year's advance tax under it is due in one instalment by 15 March.
Companies, firms and larger businesses deduct 10% TDS on professional fees once they pass ₹50,000 in the year. It is credit against the year's tax, not an extra tax. A person with professional income is in the new regime by default, can opt for the old one by the return due date, and can go back only once.
A service provider must register for GST once yearly turnover crosses ₹20 lakh, or ₹10 lakh in Manipur, Mizoram, Nagaland and Tripura.
How big an emergency fund does this pay need?
With irregular pay, two dependants on one income and ₹85,000 of spending a month, the emergency fund works out to 12 months of spending, about ₹10,20,000. Pay that can stop or slip needs more months than pay that arrives on the same date, which is why this figure differs from job to job.
How long are you liable for a finished building?
The Council's guidelines on professional liability limit the architect's liability to a maximum of three years from handover or occupation, whichever is earlier, and ask for project records to be kept for at least four years from virtual completion. They also require a professional indemnity policy agreed with the client. A policy that lapses when the practice closes can leave the last buildings uncovered, so the cover is usually carried through the liability period of the final project.
The exceptions are worth filing with the drawings: changes made by the owner, use other than the design intended, poor maintenance and the deficient service of specialised consultants are listed as outside the architect's liability. A practice should keep the letters that prove them.
Which income is closed to architects, and what goes wrong?
The conduct regulations of 1989, as amended, bar giving or taking discounts, commissions or gifts for the introduction of clients or work, and restrict advertising. A vendor's commission for being brought into a job sits close to that bar, so it is not a planning item here; a breach counts as professional misconduct.
The decision most often got wrong is growing the studio on one large commission. Rent, software seats and staff are fixed, and the fee behind them may be sitting between tender and completion. Another is leaving retirement to the sale of the practice, when the client relationships tend to leave with the principal. A fixed transfer out of each stage payment turns a lumpy fee into steady investing.
What retiring at 65 takes
A long degree, registration and a few years in someone else's studio usually come first, and many principals go on consulting well past 60. Keeping ₹85,000 a month in today's money from 65 takes about ₹15.3 crore on that day, which is ₹1.7 crore in today's money.
| Investing starts at | Years until 65 | A month, level |
|---|---|---|
| 27 | 38 | ₹29,500 |
| 37, 10 years late | 28 | ₹83,500 |
A self-employed person has no employer to pay provident fund, gratuity or group health cover, so these come from own savings. PPF takes ₹500 to ₹1,50,000 a year. PPF and your own NPS contribution save tax only in the old regime.
To put your own age, spending and savings in, use the financial independence year page.
How much life cover would the household need?
If the income stopped at 32, replacing ₹85,000 a month of spending to 85 with 6% inflation would take about ₹4.5 crore today. That is the size of term cover this household would need, before counting what is already saved and any loan still owed.
The order to do it in
- List every live project with its stage and the percentage of fee still unbilled and unpaid.
- Move a fixed share of each stage payment to tax, practice reserve, household and investing accounts on receipt.
- Hold the household reserve against a year in which two sites stop between tender and completion.
- Check that the indemnity policy runs through the liability period of your last handed-over building.
- Set the retirement target without counting any sale value for the practice or its name.
What these figures assume
The figures are planning illustrations, not forecasts. Tax is for FY 2026-27 in the new regime for a resident below 60. Spending rises 6% a year until work stops and 5% after, and lasts to 85. Investing earns 10% a year, an assumed rate for a 60:40 mix of equity and debt, before work stops and 7% after; the monthly amount stays level and starts from nothing saved. The incomes and spending are examples, not averages for the profession.
Read next
- Emergency fund in home loan overdraft: ₹51,000 vs ₹24,768
- Is ₹1 crore term insurance enough? 7 to 16 years by salary
- Step-up SIP: 5%, 10% or 15% a year on ₹25,000, compared
Other professions and situations
- corporate trainers
- fitness trainers
- freelancers
- independent consultants
- interior designers
- online tutors
- wedding planners
- clinic owners
- advocates
- AI engineers
- builders
- bank officers
- air traffic controllers
- Army officers
- actors
- MBA graduates
- DINK couples
Frequently asked questions
Sources
- The Council's schedule: retainer of 5% of fees or a minimum, 10%, 20%, 30% and 35%, 45%, 55% on tenders, 65% to 90% with construction progress, 100% on completion report and as-built drawings. (2002): coa.gov.in
- Documentation and communication charges are 10% of the professional fee. (2002): coa.gov.in
- Fee is computed on actual cost of works on completion; early stages are billed on estimates. (2002): coa.gov.in
- Liability is limited to three years from handover or occupation, records kept at least four years from virtual completion, professional indemnity policy required, and listed exceptions; disciplinary action does not absolve civil and criminal liability. (2002): coa.gov.in
- Conduct regulations bar discounts, commissions or gifts for the introduction of clients or work and restrict advertising; a violation is professional misconduct. (2003): coa.gov.in
This is general information for people in India, not personalised financial advice.